Project summary document

Project name:Sibiu UT City Loan - Phase II
Country:Romania
Project number:40338
Business sector:Municipal and environmental infrastructure
Public/Private:Public
Environmental category:B
Board date:23 March 2010
Status:Passed final review, Pending board approval
Date PSD disclosed:
Date PSD updated:
16 October 2009
1 February 2010
Local language translation:Traducere în limba română 
Date translation disclosed:3 November 2009
Help

Subscribe to PSD
email alerts

Related links
Romania homepage
Municipal and environmental infrastructure homepage

Project description
and objectives:

The EBRD is considering a loan of up to EUR 27 million (or RON equivalent) to Sibiu Municipality (the “Municipality” or the “City”) to be provided in two tranches of up to EUR 11.5 million committed and up to EUR 15.5 million un-committed (to be committed within the next two years) for a comprehensive street rehabilitation programme and construction of one small road bridge. Tranche I to be used for investments in street rehabilitation and construction of the bridge to improve traffic and lessen congestion on they key transport routes of the City. The new bridges is alongside existing structures. This phase of the Project will create a platform for introduction and implementation of a performance based management and maintenance of roads (PMMR) contract through a special feasibility study aimed at defining a local network to be covered under such contract.

Rehabilitation works of primary and secondary streets will include renewal of asphalt and pavements, including upgrade of water and sewage pipeline along the streets. The construction of one road bridge will create extra lanes for cars and additional pedestrian walkways. The project will assist the City to shape a sustainable, well-managed urban transportation system in Sibiu.

Transition impact:

Transition goals of the operation include:

Framework for markets: Output-based out-sourcing: better value for money will be achieved by wrapping multi-year maintenance activities into the urban road maintenance sector under the PMMR multi-year contracting modality, to also include the maintenance of street lighting.

Transfer of skills: The technical assistance for the PIU for development, preparation, training needs and implementation of the PMMR contracting, which will also include the maintenance of public lighting, will lead to a transfer of skills to the City’s staff employed at the Traffic and Infrastructure Departments responsible for design, execution and management of the road network in the City.

Demonstration: the introduction of PMMR in Sibiu represents the first time this will be done at the urban level in Romania. (MEI's previous effort was with Brasov County roads.) PMMR will provide the foundation for a broader effort, to be promoted through dialogue at the national level, to introduce Transport Asset Management across the principal cities in Romania. Once implemented, PMMR and Asset Management can be expected to be replicated by other leading cities in the country.

The client:

Sibiu Municipality.

EBRD finance:

Up to EUR 26.5 million loan to the City to be provided in two tranches of up to EUR 11.5 million committed and up to EUR 15.0 million un-committed (to be committed within the next two years).

Total project cost:

Up to EUR 32.4 million.

Environmental impact:

Categorised B (2008).

The environmental and social due diligence, which included an independent audit and analysis, confirmed that the environmental and social impacts associated with the street rehabilitation programme and construction of one small road bridge will be mainly positive. The due diligence also confirmed that there will be no physical or economic displacement as a result of the Project and concluded that the management capacity of the Company to manage EHS and social issues will need to be developed during project implementation. There will be localised moderate impacts during the road improvement works related to noise, dust and vibration, generation and disposal of waste and temporary traffic restrictions.

However, a comprehensive environmental and social action plan (ESAP) for Sibiu road rehabilitation has been developed to avoid, minimise and mitigate any potential adverse environmental and social impacts and liabilities arising from the project's construction and operation, and to ensure compliance with the respective EBRD's Performance Requirements (PRs). The ESAP will form part of the Loan Agreement. A Stakeholder Engagement Plan is prepared to ensure that communication with the relevant stakeholders is handled properly throughout project preparation and implementation, including the appropriate grievance procedure. The Municipality will submit to EBRD annual reports on environmental and social matters including progress on the implementation of the environmental and social action plan.

Technical
cooperation:

It is expected that Technical Cooperation assistance will be provided to assist the city of Sibiu for:

  • Street rehabilitation and bridge construction - technical scoping
  • Environmental Due Diligence

It is anticipated that the above TC assignments will be financed from the Bank’s own resources.

  • Procurement and Implementation Support including preparation of tender documents, PMMR training and monitoring.
  • Supervision Engineer (including Structural Engineer).

It is anticipated that the above TC assignments will be financed by the loan.

 

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Dana Craciunescu , Operation Leader: craciund@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com

Public Information
Policy (PIP):

The PIP sets out how the EBRD discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations.
Text of the PIP

Independent Recourse
Mechanism (IRM):

The EBRD has established the IRM to give local groups that may be directly and adversely affected by a Bank project a means of raising complaints or grievances with the Bank, independently from banking operations.
Guidelines for Making a complaint and the Rules of procedures


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.